HOME

Language

UPPER CHAKU KHOLA HPP


Project Address: Kathmandu, Nepal

Rated head: 804m, rated discharge: 3.4m3/s

Installed capacity: 2 x 11.1 MW

Type of turbine: Pelton turbine

Project duration: From Oct. 2012 ~ 2017 (Under construction).

Scope of supply: Design, Manufacture, Supply, Package and Transport, Supervision during installation testing and commissioning, Handover of Electrical& Mechanical equipments, including turbine, MIV, governing system, generator, excitation system, AC&DC power system, synchronizing &protection system, HV switching system, Transformer, Plant power system and auxiliary systems, EOT, cables, tools and spares etc.